A committed portfolio of grid-connected battery sites across Latvia — owned, built and operated by us.

The platform

The portfolio — in build

JUN 2026

Lead site (2.6 MW)

energised — first revenue

JAN 2027

6.7 MW operational

all four sites operational

JUN 2027

Valmiermuiža (4.99 MW)

COD — 11.7 MW operational

JUL 2027

Aizkraukle B (5 MW)

COD — 16.7 MW operational

OCT 2027

Valmiera (9 MW)

COD — 25.7 MW operational

Krustpils

2.6 MW

COD
Jun 2026
Land
Third-party
Status
Live revenue

Inčukalns

0.49 MW

COD
Dec 2026
Land
Owned
Status
Under construction

Aizkraukle A

1.0 MW

COD
Mar 2026
Land
Owned
Status
Live revenue

Viļaka

2.6 MW

COD
Jan 2027
Land
Owned
Status
Under construction

Aizkraukle B

8 MW

Phasing
5 MW + 3 MW
Land
Owned
Status
Project design & permitting

Valmiera

9 MW

COD
Oct 2027
Land
Owned
Status
Project design & permitting

Valmiermuiža

4.99 MW

COD
Jun 2027
Land
Owned
Status
Project design & permitting

CASE STUDY

Krustpils — operational six months after land acquisition.

2.6 MW, built with our own capital, live and earning since June 2026.

Read the case study
Krustpils battery storage site in Latvia during construction